The work on metro line 4 includes the comprehensive renovation of 6 kilometers of track to improve reliability, reduce incidents and reduce vibrations on the route.
As an alternative to the cuts, the metro lines close to the affected area will be strengthened, L1, L2 and L3, as well as the regular bus lines 6, V19 and V21. Users can use the Cercanías service or the shuttle bus that will be set up and that will work during the metro schedule, with a frequency of 3 or 4 minutes on weekdays.
In the tram network, the connection of the T4 tracks with the new section under construction of Les Glòries and Diagonal makes it necessary to cut this entire Tram line and to end the route of lines T5 and T6 at the La Farinera stop. .
As an alternative, users can use the metro service, the regular bus lines 7, H14, H16 and V21, the Cercanías service or the shuttle bus that will be enabled and will have nine stops along the route with the same schedule than the tram.
You can check the status of the public transport network and calculate the best way to get around on the mobility website.