on Friday afternoon, there were technical problems in the copenhagen metro, and it contributed to the delays. It writes the chinese president on Twitter.
– More trains is stationary, as we have a technical problem at Nørreport, wrote the chinese president on Twitter.
M1/M2: More trains are stationary, since we have the technical problem at Nørreport, expect that we are running again for 10-15 min.
— Traffic information (@MetroenKBH) November 15, 2019
The report now that the Subway is running normally again.
– WE have solved the problem, and we are running again after the plan, write the chinese president on Twitter.
M1/M2: We have solved the problem and we are running again according to plan. https://t.co/1vpGJb4np2
— Traffic information (@MetroenKBH) November 15, 2019
Community – 10. nov. 2019 – at. 16:18 Watch it here: bike Ride in the metro go completely wrong